Severity and priority in triage
At triage QA sets severity from the defect's impact, while the PO or a manager assigns priority from audience, deadline and fix cost. Not everything gets P1: priority is tied to response times (SLA) agreed by the team. If QA disagrees with a priority, QA lays out the consequences as facts and records the disagreement in the ticket.
QA Fundamentals · Bugs and bug reports
Five bugs at triage and all are P1. How to bring order without upsetting the team?
Before a release the team goes through the bug queue (triage). Five tickets, and all have priority P1, because each author thinks their own bug is the most important. The developers do not know where to start, the PM cannot decide what to defer, and QA feels guilty because QA set the ratings. This lesson is about triage in practice: the criteria for keeping severity and priority apart, the response times tied to priority and what to do when the PO disagrees with the QA rating. What severity and priority are and how they differ is covered in the lesson "How does severity differ from priority?".
How it works and why. At triage QA sets severity from the impact of the defect, while the PO or a manager assigns priority from business needs. They do not always match, and that is normal: classic examples of such a divergence are in the lesson "How does severity differ from priority?". So that the ratings do not depend on mood, each has its own set of questions:
What decides severity and what decides priority
Severity: the impact of the defect
What breaks: a function, data, money, security. Whether it blocks other scenarios. Whether there is a workaround. Whether the data can be restored. QA answers.
Priority: the order of fixing
How many users and how much money are affected. The release deadline. Contract and regulatory requirements. The cost and risk of the fix. Whether it blocks other work. The PO answers.
Example: triage before a release. Below is the same queue of five bugs, with severity and priority kept apart, and a decision that follows from both:
| Bug | Severity and priority | Decision |
|---|---|---|
| After a password change the session on another device stays active | Critical (a security problem), P1 (a regulatory requirement, a small fix) | In this release |
| A PDF report does not open for orders with Cyrillic in the title (5%) | Major (a function breaks for part of the data), P2 (customers complain) | In this release if we make it |
| The partner's logo is blurred on the home page | Minor, P2 (a partner demo next week) | A quick fix before the demo |
| The "Export" button is inactive in Safari 15 (2% of users) | Major, P3 (a small audience, there is a workaround) | Next sprint |
| An English error text contains a leftover Ukrainian word | Trivial, P4 | To the backlog |
Now the queue has an order, and it can be explained to every author. Four things are worth noticing. The criteria answer "why exactly so", not "it seems to me". The first bug has the highest pair of ratings, because security problems can rarely be deferred and the fix is small. The third bug has low severity but priority P2: a classic divergence, explained by an outside factor (the demo). And the priority of the fourth ticket can change: if there are more reports, it will rise.
Many teams tie response times (SLA) to priority. This is an example, the actual numbers are set by the team:
| Priority | Response | Fix |
|---|---|---|
| P1 | within 1 hour | in this release or a hotfix |
| P2 | within 1 working day | in this release if we make it |
| P3 | at sprint planning | in the next sprint |
| P4 | as needed | when we get to it |
Limits and alternatives. The levels of severity (for example, from blocker to trivial) and priority (high, medium, low or P1–P4) and their criteria depend on the team, so on a project it is worth agreeing on them once and writing them down. Two scales make sense when the team actually works with them. Small teams often keep one scale (most often priority), and then the impact of the defect is described in text. Sometimes a third dimension (frequency) is added, or severity and likelihood are combined into a risk matrix: this is done in risk-based testing. In standard Jira the field is called Priority, and severity has to be added as a custom field. If severity was not discussed at the start of the project, testers set it differently and the ratings stop being comparable. Priority is not fixed for ever: as a release approaches, with customer complaints or plan changes it is recalculated, while severity is changed only when something new is learned about the defect itself. In the end QA stays in the role of an adviser: proposes a rating and explains it, but the final word on priority belongs to the business. If QA disagrees with a decision, the disagreement is recorded in the ticket, and the numbers are not changed quietly.
Common mistakes.
- Setting P1 on everything: when everything is urgent, nothing is, and the queue loses its meaning.
- Mixing the scales: "severity high, because I want it fixed faster". Speed is priority.
- Setting severity by the number of users: that is the impact on the business and part of priority, while severity depends on what exactly breaks.
- Not changing priority after the context changes: a bug that was P3 can become P1 before a release.
- Not agreeing on levels and criteria at the start of the project: the ratings of different people do not match.
Check yourself
An application crashes if you paste 10,000 characters into the "Notes" field, while normal notes are up to 300. What severity and priority, and what decides?
Answer
Severity is high (a crash), but it touches extreme input and the workaround is obvious. Priority depends on the business: how many users could paste such a volume (copying from a document), whether a leak or loss of data is possible. If it is rare and without consequences, P3, and the fix goes in the planned order.
QA believes a bug deserves P1, and the PO assigns P3. What does QA do?
Answer
Lays out the arguments as facts: whom it affects, what the consequences are, whether there is a workaround, what about the deadline. If the PO does not change the decision, QA records the disagreement in the ticket and may raise the question again if new data appear (complaints, a rise in frequency). Replacing the priority on your own is not an option.