Requirements changed after you had already tested the feature. What do you do?
When requirements change after testing, impact analysis follows traceability from the changed requirement to cases, tests and documents. Direct dependencies are checked first, then indirect ones (adjacent functions, API, texts), and each case gets a state: obsolete, update, rerun or unaffected. The time estimate is reported to the team, not silently absorbed.
QA Fundamentals · Situational questions
You closed a feature on Thursday. On Friday the PM writes: "We changed our mind, the limit will be different". What do you retest?
Requirements change because the business changes, not because someone is careless. The interview question checks whether you see the consequences of a change beyond one line: obsolete cases, affected functions, automated tests, documentation, deadlines. A weak answer: "I will retest". A strong one shows how exactly to determine the scope and what to tell the team.
How it works and why. Test cases are derived from requirements, so a change in a requirement changes everything that derives from it. This is what traceability is for: from a requirement to cases and to automated tests. The impact analysis goes in two steps. First the direct dependency: which cases checked the changed requirement and are now obsolete or need new data. Then the indirect one: what else depends on the changed thing (neighbouring functions, the API contract, reports, error texts, help). Each case then gets one of four states: obsolete, needs updating, needs a rerun, not affected. Only after that do you estimate the time and inform the team.
What to do when a requirement has changed
Example: from "I will retest" to an impact table. The weak answer: "I will retest the limits". The strong one has the change and the state of each case:
Change PAY-142 v2: the daily transfer limit 15000 -> 10000 UAH.
PO decision, Friday, recorded in the ticket.
T-14 boundary 15000 obsolete: the new boundary is 10000
T-15 over the limit update the error text
T-21 two transfers a day check: the amount accumulates
T-30 transfer of 100 not affected
API contract /limits a field changed: update the autotest
Help "up to 15000" fix the text
Estimate: ~3 hours. The release does not move if the
requirement does not change again.
The table shows that more than one boundary changed: the error text, the daily accumulation, the API test and the help text are affected. "I will retest the limits" would miss half. It also shows that part of the cases is not affected, so there is no need to rerun everything. The last line about timing shows the team that this costs time and leaves them to decide if that is acceptable.
Limits and alternatives. Late changes are sometimes unavoidable (regulatory requirements, agreements with a customer), so the question is not "why did it change" but "how does it change the scope and timing". If the change is large, the trade-off is discussed honestly: shorten another part of testing, shift the release or move the change to the next one. There are also systemic causes: if requirements change after testing every time, that is a topic for a retro and for the Definition of Ready (a task enters the sprint with stable requirements). It also helps to agree whether a late change is filed as a separate task, because that affects statistics, and so that the ticket history does not lose what was checked against the previous version.
Common mistakes
- Accepting a change verbally and not recording it: a week later nobody remembers what changed and who decided.
- Retesting only the changed line: neighbouring functions, the API and texts stay on the old rules.
- Forgetting automated tests and documentation: they quietly become wrong and give red builds or mislead.
- Quietly absorbing the retesting in your own time: the team does not know the release is at risk until it is late.
- Blaming the PM: changes are natural and the topic for discussion is the process, not a person.
Check yourself
A requirement changed from "limit 15000" to "10000", and case T-30 is a transfer of 100. Does it need to be run again?
Answer
It does not depend on the limit, so by the impact table it is not affected, and a full rerun is not needed. But if the case is part of a regression set that runs on the release anyway, it will run with it. The decision "do not rerun everything" rests on traceability, not on a guess.
Why must the time estimate for a change be reported to the team, even if you make it in the sprint?
Answer
Because a change has a cost and the team needs to see it to weigh further changes. If QA quietly absorbs the retesting the process does not see the problem and nothing changes. The estimate can also turn out inaccurate, and it is better that the risk is known in advance.