The customer asks to skip testing to make the release. What do you do?
When a customer asks to skip testing, QA offers options instead of refusing: the risk belongs to the product owner, and QA makes it concrete. Consequences of what is unchecked are put in business terms (failed payments), with a full, a reduced and a no-testing option with their timelines, and the decision is requested in writing. The report never says tested where nothing was tested.
QA Fundamentals · Situational questions
The customer asks to skip testing to make the release at the end of the week. Refuse or agree?
An outsourced project, the customer writes in the chat: "We need to ship on Friday, skip testing, we will sort it out later". Testing is not finished, and the release has payment changes. The answer "you can't do that" sounds principled but changes nothing: the customer will reply that the decision is theirs, and they will be right. This lesson is about how to turn "skip it" into a conscious decision with options, prices and a signature.
How it works and why. Testing is not a barrier that QA keeps closed. It is a way to get information about risk, and the risk belongs to whoever is responsible for the product, in your case the customer. So QA's role here is: make the risk concrete (what exactly is not verified and what can break), offer options between "everything" and "nothing", record the decision in writing and prepare protection in case of a mistake (a post-release check, a rollback). A customer who hears "the risk is high" decides nothing. A customer who sees "payment with 3-D Secure is not verified, a failure means declined payments" decides consciously.
A flat refusal or options with a price
"You can't do that"
The customer hears resistance and gets nothing to respond to. The decision will still be theirs, but without information.
Three options with risks
Full, reduced, no testing: each with a date and what stays unverified. The decision is in writing.
Example: from a refusal to a message that can be signed off. The weak reply:
This is impossible, we will not release without testing.
It has no options, no risk and no way forward. The strong version:
Subject: Release 1.8: options and risks
I understand the goal: to ship on Friday. There are three options:
A. Full testing: 3 days, release on Tuesday.
B. Reduced (recommended): critical flows + the release changes,
about 6 h, release on Friday.
C. No testing: release on Friday, the highest risk.
Unverified in B: statement export, rare browsers.
In C: everything, including payment with 3-D Secure and the updated amount
validation, and a defect there means failing payments.
For C we need your written confirmation that you accept this risk.
In any option: a check of the main flows right after the release,
a rollback ready to 1.7.4, someone reachable on Friday evening.
Please choose an option by 12:00 on Thursday.
What works here. Option B gives the customer what they want (Friday) and keeps the most important thing: payments are verified. The risk is named in terms of consequences ("declined payments"), not in testing terms. Choosing C is possible but needs a written confirmation, and that is not a threat but a way to make the decision explicit. The post-release check and the rollback are in every option, because they reduce the cost of a mistake whatever the decision. The deadline for the answer keeps the question from hanging.
Limits and alternatives. There are cases where the customer cannot decide alone: regulatory requirements, a contract that demands testing, changes that concern money or personal data. Then the question is raised with your own manager or lead, not only with the customer. QA does not sign "tested" where it did not test: the report states clearly what was verified and what was not. Other ways to reduce the cost of a mistake: release in parts behind a feature flag, open the new version gradually (canary), exclude the riskiest change from the release. In a product company the PO plays a similar role, and the conversation is the same.
Common mistakes.
- Answering "you can't do that": you lose the conversation, and the customer decides without your information.
- Naming the risk in general terms ("it may be bad"): the customer cannot weigh it.
- Agreeing orally and writing nothing down: after an incident responsibility gets blurred.
- Offering only extremes: full testing or nothing, with no middle option.
- Quietly switching to "reduced" and not telling what stays outside the check.
Check yourself
The customer picks option C (no testing) and asks you to write "tested" in the report. What do you do?
Answer
I do not write "tested", because it is untrue. In the report I record what was verified (nothing or a limited set) and that the decision to release without testing was made by the customer, with a link to their written confirmation. I inform my manager, and I propose the post-release check and the rollback anyway.
Why is it better to describe the risk in the message as "failing payments" rather than "3-D Secure is not verified"?
Answer
Because the customer weighs consequences for the business, not testing terms. "Failing payments" is clear without context and lets them estimate the cost. The technical wording can be added next to it, but the first sentence should state the consequence.