QA Interview Hub · Knowledge base · Quizzes · Українська

CI/CD › Pipeline and quality gates

What to run on a PR, on merge and nightly

The more expensive a suite is in time, resources and instability, the less often and the later it runs. A PR gets fast, stable checks (lint, unit, API, e2e on critical paths) as required checks, a merge into main gets a wider suite and a smoke run after the deploy to staging, and the nightly run gets the full regression and quarantined tests. Cheap stages run first (fail-fast).

CI/CD · Pipeline

Full e2e on every commit: a 40-minute wait. What should really block a PR?

A team turns on the full e2e suite for every PR. At first that feels safe. A month later a PR waits 40 minutes, developers start the next task and stop looking at red statuses. Automated tests nobody reads protect nothing. This lesson is about how to spread suites across a PR, a merge and a nightly run.

How it works and why. The main rule: the more expensive a suite is (time, resources, instability), the less often and the later it runs. Every level answers its own question and has its own time budget.

Three run levels

1. Pull request: up to ~10 minlint, unit, API, build, smoke e2e2. Merge to main: 20-30 minwider e2e, deploy to staging3. Nightly run: hoursall browsers, visual, long flows
Figure 1. Only the first level blocks a merge, the rest signal. The time budgets are rough, tune them per team.
  • Pull request: lint and typecheck, unit, API and contract tests, the build, e2e only on critical paths (login, the main product action). These are required checks: no merge without a green status.
  • Merge to main: a wider suite and a deploy to staging with a smoke run after it. A failure here means the PR suite missed something and should be extended.
  • Nightly on a schedule: the full regression, all browsers, visual and performance checks, a run of quarantined tests. The result is a report and a notification, not a merge block.
  • Manual run (workflow_dispatch): repeat a long suite on any branch or environment.

Stages in a run follow fail-fast: cheap checks (lint, unit) go first, slow e2e after them through needs. A failure that lint could catch in a minute should not wait for a browser. Independent jobs (for example API tests and the build) run in parallel.

Example: one file for three levels. Triggers decide what runs, and an if on a job keeps the expensive suite away from PRs:

name: ci
on:
  pull_request:
  push:
    branches: [main]
  schedule:
    - cron: '0 1 * * *'
  workflow_dispatch:

jobs:
  fast:
    runs-on: ubuntu-latest
    timeout-minutes: 10
    steps:
      - uses: actions/checkout@v7
      - uses: actions/setup-node@v7
        with: { node-version: 22, cache: npm }
      - run: npm ci
      - run: npm run lint && npm run typecheck
      - run: npm test

  smoke:
    needs: fast
    runs-on: ubuntu-latest
    timeout-minutes: 15
    steps:
      - uses: actions/checkout@v7
      - uses: actions/setup-node@v7
        with: { node-version: 22, cache: npm }
      - run: npm ci
      - run: npx playwright install --with-deps chromium
      - run: npx playwright test --grep @smoke

  full:
    if: github.event_name != 'pull_request'
    needs: fast
    runs-on: ubuntu-latest
    timeout-minutes: 60
    steps:
      - uses: actions/checkout@v7
      - uses: actions/setup-node@v7
        with: { node-version: 22, cache: npm }
      - run: npm ci
      - run: npx playwright install --with-deps
      - run: npx playwright test

smoke is filtered by an @smoke tag in the test title (--grep @smoke), so the "critical path" is a team agreement, not separate code. What blocks the merge: on a PR only fast and smoke are required, and full is skipped on a PR (status skipped). Playwright's own CI config, sharding and Docker are in the lesson “CI: sharding, Docker and fast reruns”.

A quality gate is the set of conditions code must meet to move on: all required checks green, no new critical defects, coverage of new code above a threshold, no flaky tests in the blocking suite. The fewer conditions rest on someone's word, the better: every condition is checked automatically. Required checks are set in branch protection or rulesets by job name.

What blocks a PR

Wrong

Everything on every PR

Full e2e, all browsers and visual tests. Time grows, a flaky test blocks other people's changes, people stop looking at statuses.

Right

A fast core on PR, the rest later

On a PR only what catches a critical-path break within minutes. The full regression on main and nightly, with a report.

Figure 2. Only a fast and stable suite deserves to block a PR.

Limits and alternatives. If a workflow is skipped because of a path or branch filter, its required check stays Pending and the merge is blocked. A job skipped through if counts as successful. So either filter at job level, or add a summary job and make it the only required one. For a small project three levels are overkill: one run per PR plus a nightly is enough.

Typical mistakes.

  • A full regression on every commit: feedback is slow and developers work around it.
  • A nightly suite with no owner: it stays red for weeks and nobody reacts.
  • A required check whose name no longer exists after a job rename: the PR hangs in Pending.
  • Gate conditions rest on someone's word instead of automatic checks.
  • A deploy to staging with no smoke run after it: a broken environment is found later.

Check yourself

Why did a PR stop being mergeable after a job was renamed in the workflow, although every run is green?

Answer

A required check in branch protection is bound to the job name. Nobody reports the old name any more, so the status stays pending. The fix: update the required checks to the new name, or use a summary job with a stable name.

What should stay in the PR suite and what should move to nightly?

Answer

Keep the fast and stable on the PR: lint, unit, API, the build and e2e of critical paths. Move the slow and wide to nightly: all browsers, visual tests, long flows, performance, quarantine. The criteria are time, stability and risk of breakage.

In an interview. Junior: A PR runs fast checks: lint, unit and a few e2e tests on the main path. The full regression runs after a merge or at night, otherwise developers would wait too long. Middle/Senior: I spread suites by cost and risk: a PR within ~10 minutes with required checks, a wider suite on main with a smoke run after the deploy, nightly with all browsers and quarantine. The order is fail-fast, the quality gate is automatic, and required checks are tied to a stable job name. A failure on main is a signal to extend the PR suite.

More articles in this chapter